Breadcrumb

Library

D 1.1.1: Crossfreight Business Process and ICT tools AS IS SCENARIO

D.1.1.1_Crossfreight_AS IS Scenario

This paper aims to present an in-depth analysis of business processes in the railway nodes identified within the CROSSFREIGHT project, with the objective of recognising the AS IS scenario and operational processes. The focus is on operational efficiency, bottleneck analysis and the integration of digital solutions to improve the management of freight flows and shunting operations. This AS IS analysis, proposes to highlight possible bottlenecks in the management of railway operations and infrastructure utilisation. Therefore, this document is intended to represent the starting step on which to elaborate the pilots to be realised within the project, contributing to present an integrated analysis of the railway operations of the partners.

Documents

Title Published Download
D 1.1.1: Crossfreight Business Process and ICT tools AS IS 29/12/2025

D. 1.2.1: Crossfreight Railway Business Process TO BE

D.1.2.1: Crossfreight Railway Business Process TO BE

This deliverable presents a comprehensive and detailed overview of the future scenario (TO BE) designed for the CROSSFREIGHT project, which aims to enhance the efficiency, integration, and sustainability of cross-border rail and port logistics. Building upon a structured top-down approach, complemented by strong bottom-up contributions, this report provides clear guidance for optimizing shunting operations and business processes within a variety of railway nodes and intermodal terminals.

 

 

Documents

Title Published Download
D.1.2.1_Adriafer_Final_Version.pdf 08/01/2026

D.2.2.1 – Field Operation Test Plan

D.2.2.1 – Field Operation Test Plan

The purpose of this document is to detail the methodology used and how it has been modified to best suit the objectives of the CROSSFREIGHT project.This approach aims to consolidate the implementation strategy for the subsequent phases of the pilot project for each project partner and allows each partner to specifically illustrate the "flow of actions" underlying the pilot project's development.

Documents

Title Published Download
D.2.2.1 - Field Operation Test Plan 12/01/2026
Our contact form is open for all your requests