Crossfreight Business Process and ICT tools AS IS SCENARIO

Crossfreight_AS IS Scenario

This paper aims to present an in-depth analysis of business processes in the railway nodes identified within the CROSSFREIGHT project, with the objective of recognising the AS IS scenario and operational processes. The focus is on operational efficiency, bottleneck analysis and the integration of digital solutions to improve the management of freight flows and shunting operations. This AS IS analysis, proposes to highlight possible bottlenecks in the management of railway operations and infrastructure utilisation. Therefore, this document is intended to represent the starting step on which to elaborate the pilots to be realised within the project, contributing to present an integrated analysis of the railway operations of the partners.

Documents

Title Published Download
D 1.1.1: Crossfreight Business Process and ICT tools AS IS 29/12/2025

Crossfreight Railway Business Process TO BE

Crossfreight Railway Business Process TO BE

This deliverable presents a comprehensive and detailed overview of the future scenario (TO BE) designed for the CROSSFREIGHT project, which aims to enhance the efficiency, integration, and sustainability of cross-border rail and port logistics. Building upon a structured top-down approach, complemented by strong bottom-up contributions, this report provides clear guidance for optimizing shunting operations and business processes within a variety of railway nodes and intermodal terminals.

 

 

Documents

Title Published Download
D.1.2.1_Adriafer_Final_Version.pdf 08/01/2026

Field Operation Test Plan

Field Operation Test Plan

The purpose of this document is to detail the methodology used and how it has been modified to best suit the objectives of the CROSSFREIGHT project.This approach aims to consolidate the implementation strategy for the subsequent phases of the pilot project for each project partner and allows each partner to specifically illustrate the "flow of actions" underlying the pilot project's development.

Documents

Title Published Download
D.2.2.1 - Field Operation Test Plan 12/01/2026

Field Operational Tests Report on execution

Field Operational Tests Report on execution

This document provides a comprehensive technical and operational account of the execution phase of the Field Operational Tests (FOT) conducted across the project’s 6 pilot nodes. Its primary purpose is to document and validate the ICT solutions developed to optimize rail-port integration, shunting processes, and logistics security, demonstrating the transition from the theoretical scenarios to practical, real-world applications.

Documents

Title Published Download
Deliverable 2.2.1 Field Operational Tests Report on execution 04/08/2026

Field Operational Tests Impact Assessment

Field Operational Tests Impact Assessment

This report provides a comprehensive assessment of the impacts generated through the Field Operational Tests (FOTs) conducted in Work Package 2 of the CROSSFREIGHT project. While Deliverable D.2.2.1 documented what was executed during each pilot, the present Deliverable D.2.3.1 evaluates how these tests performed and what impacts they generated across multiple dimensions.

Documents

Title Published Download
Field operational tests Impact Assessment 04/08/2026

Transferability Analysis

Transferability Analysis

The WP3 Transferability Analysis assessed the potential to replicate  solutions in at least five additional intermodal nodes. Transferability potential was rated medium to high across all pilots, though conditional upon factors such as digital infrastructure readiness, governance structures, data availability, and stakeholder willingness to adopt new procedures. Importantly, each partner expressed readiness to support further uptake of their solution through knowledge sharing, peer-to-peer sessions, site visits, and provision of training materials—strengthening the project’s cross-border value.

Documents

Title Published Download
Transferability Analysis 04/08/2026

Exploitation potential and policy recommendations

Exploitation potential and policy recommendations

This deliverable is aimed at providing the overall exploitation strategy and policy recommendations for the CROSSFREIGHT concept and ICT solutions deployment in the real-word rail operators’ market.

 

Documents

Title Published Download
Exploitation potential and policy recommendations 04/08/2026

Action Plan

Action Plan

This document provides a structured roadmap for exploiting and transferring the digital innovation outcomes of the CROSSFREIGHT project (Interreg VI-A Italy-Croatia, ITHR0200487) to additional intermodal nodes across the Adriatic-Ionian region and beyond. This deliverable is produced under Work Package 3, Activity 3.3, and is led by the Port of Šibenik Authority (PP7) in close collaboration with all eight project partners.

Documents

Title Published Download
Action Plan 04/08/2026