D.5.2.1 Report on timing options and testing of methodology in each pilot area
Updated on :26/10/2021
WP 5 - This document is the deliverable D.5.2.1 Report on timing options and testing of methodology in each pilot area and shows the timeline of the training events of the project and the timeline of the methodology application by the pilot areas.